Order JO 6030.31H - National Airspace System (NAS) Infrastructure Failure Response
Document Information
- Type
- Order
- Number
- JO 6030.31H
- Title
- National Airspace System
(NAS) Infrastructure Failure Response - Date issued
- 2023-06-16
- Status
- Active
- Office of Primary Responsibility
- AJW-183, NAS Operations Policy Team
- Access restriction
- FAA Network Only
- Contact information
-
Krystle Lewis
krystle.lewis@faa.gov
202-267-7474 - Content
-
-
6030.31H, National Airspace System (NAS) Infrastructure Failure Response (PDF)
This order establishes Technical Operations policy on the National Airspace System (NAS) infrastructure response times to include strategic response planning and local operational decision making. This order assigns standard baseline response codes for Federal Aviation Administration (FAA) owned and/or maintained NAS equipment.
-
6030.31 Information Web Page
More information about this Order can be found at the URL above.
-
6030.31H, National Airspace System (NAS) Infrastructure Failure Response (PDF)
- Cancels
-
Cancelled documents Number Title Date JO 6030.31G National Airspace System Infrastructure Failure Response 2016-02-25